Automatic loading for IMAX injectors
The automatic loading of the injector can be adapted optimally to the product and production conditions. This is made by individual drainage programs.
Automatic drainage system for MAX massage units
Automatic control of the drainage process
The massage unit to be drained controls the opening of the drainage flap and the speed of the drainage belt and removal belt. In this way, an optimal, safe product flow is reached during drainage, depending on the recipe.
Drainage belt
The drainage belt can be moved on rollers and is positioned between the MAX massage unit and the removal belt in order to connect the two components. The intelligent control unit detects the position and releases the drainage process.
Removal belt
The removal belt is used to connect the drainage belt to a drainage tank.